| Announcements |
|---|
|
Sunday, August 06, 2006 • Title: Test Announcement • Edited: Tuesday, January 22, 2008 Entry ID: 210 • Client: Demo Group |
|---|
Test Announcement content here. Retested.
(0) Comments • eMail This • Print This • Permalink
|
Tuesday, January 16, 2007 • Title: About the Demonstration Site • Edited: Friday, November 16, 2007 Entry ID: 13 • Client: Development Test Group 1 |
|---|
The Demonstration Site serves the following purposes:
- As implemented here, it is a way for you to familiarize yourself with how JobWarden works from your customers’ or providers' point of view
- As implemented in your site, it will serve both as a demonstration for the benefit of your prospects, and as an online help for your existing users
- Access will be controlled by password and
- The banner name on each page will be the name of an individual customer
- News and
- Priority
The “Customers’ Jobs” Pages The “Jobs” pages of each customer’s area will of course be used to display job status and related items.
|
Friday, November 16, 2007 • Title: Testing • Edited: Friday, November 16, 2007 Entry ID: 506 • Client: Development Test Group 2 |
|---|
Testing
| Jobs |
|---|
Tuesday, December 12, 2006 • Title: Dental Lab Case - Doctor Cusp DDS. Patient: Mya Molar • Edited: Tuesday, November 20, 2007 • Entry ID: 40 • Client: Development Test Group 2 |
|---|
Job Description
|
|---|
Prescription
28-31 PFM bridge with stressbreaker between 28 and 29
360 degree metal collar on #28 and 31
Shade: A2
Job Sheet
4 Unit posterior porcelain fused to metal bridge #28-#31
Stressbreaker
High noble silver coloured alloy
High fire porcelain
Shade: A2
Team
|
|---|
| Member Name | Member Role | Comments | Entry ID |
|---|---|---|---|
| Henry Tudor | Team Leader | Skuthrôpaz' hêd' hellada en gunê exênthismenai pragmata | 123 |
| Richard Plantagenet | Team Member | Orthostadia encheleis d' ara g' soi ê te ho erriptasmenon tachu kai hêmeis su. | 124 |
| Thomas Tallus | Team Member | 125 |
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Assigned to | Comments | |
|---|---|---|---|---|---|---|---|---|
Activity Incomplete |
Entry ID 152 Sun, 19 Mar 06 6:08 Ceramic Workup |
A | 0D:0H:0M | 0D:0H:0M | Richard Plantagenet | |||
| S | 2005-09-26 13:08 | 0D:0H:0M | 0D:0H:0M | |||||
Milestone |
Entry ID 495 Fri, 2 Nov 07 15:28 Testing new single entry code |
A | 0D:0H:0M | 0D:0H:0M | Henry Tudor | Enter comments here | ||
Job Start |
Entry ID 150 Sun, 19 Mar 06 4:57 Start Mya Molar Case |
A | 2005-09-21 11:57 | 0D:0H:0M | 0D:0H:0M | Thomas Tallus | ||
| S | 2005-09-20 11:57 | 0D:0H:0M | 0D:0H:0M | |||||
Activity Completed |
Entry ID 41 Sun, 16 Oct 05 7:09 Driver collected job, checked in, disinfected and scheduled. Stressbreaker attachment ordered in. |
A | 2005-09-21 15:13 | 2005-09-21 18:16 | 0D:3H:3M | 0D:3H:3M | Henry Tudor | No suitable stressbreaker in inventory. |
| S | 2005-10-21 15:00 | 2005-10-21 19:00 | 0D:4H:0M | 0D:4H:0M | ||||
Activity Completed |
Entry ID 42 Sun, 16 Oct 05 7:19 Stressbreaker arrived. Job transferred to model/prep department. Models poured, trimmed, pinned, articulated and dies cut out. |
A | 2005-09-22 11:22 | 2005-09-22 15:22 | 0D:4H:0M | 0D:7H:3M | Richard Plantagenet | Received e-mail authorizing us to trim and die-cut the models. Ready for Wax/Finishing Department |
| S | 2005-08-22 11:22 | 2005-08-22 15:22 | 0D:4H:0M | 0D:8H:0M | ||||
Activity Completed |
Entry ID 43 Sun, 16 Oct 05 7:22 Step 1. Wax up abutment coping #28 with female part of stressbreaker. Finish #28 |
A | 2005-09-22 15:25 | 2005-09-23 18:00 | 1D:2H:35M | 1D:9H:38M | Thomas Tallus | |
| S | 2005-09-21 15:25 | 2005-09-22 18:00 | 1D:2H:35M | 1D:10H:35M | ||||
Activity Completed |
Entry ID 44 Sun, 16 Oct 05 7:25 Step 2. Wax up 29-31 with male part of stressbreaker. Finish #29-31 |
A | 2005-09-26 08:27 | 2005-09-26 13:28 | 0D:5H:1M | 1D:14H:39M | Henry Tudor | |
| S | 2005-09-26 08:27 | 2005-09-26 15:42 | 0D:7H:15M | 1D:17H:50M | ||||
Activity Completed |
Entry ID 45 Sun, 16 Oct 05 7:27 Step 3. Quality control bridge fit and correct design. |
A | 2005-09-26 15:29 | 2005-09-26 18:13 | 0D:2H:44M | 1D:17H:23M | Richard Plantagenet | Ready for ceramic department |
| S | 2005-09-22 09:47 | 2005-09-22 11:48 | 0D:2H:1M | 1D:19H:51M | ||||
Milestone Reached |
Entry ID 151 Sun, 19 Mar 06 6:03 Transfer to Ceramic Department |
A | 2005-09-27 09:00 | 0D:0H:0M | 1D:17H:23M | |||
| S | 2005-09-23 13:03 | 0D:0H:0M | 1D:19H:51M | |||||
Milestone Reached |
Entry ID 494 Fri, 2 Nov 07 7:02 Enter event description here |
A | 2007-11-02 14:03 | 0D:0H:0M | 1D:17H:23M | Henry Tudor | Second try | |
| S | 2007-11-02 14:03 | 0D:0H:0M | 1D:19H:51M | |||||
Milestone Reached |
Entry ID 493 Fri, 2 Nov 07 6:45 Enter event description here |
A | 2007-11-03 13:45 | 2007-11-04 13:45 | 0D:0H:0M | 1D:17H:23M | Henry Tudor | No comment! |
| S | 2007-11-02 13:45 | 2007-11-03 13:45 | 0D:0H:0M | 1D:19H:51M | ||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Documents
|
|---|
| Title | Date | Last Edit | Entry ID | |
|---|---|---|---|---|
| To Dr Cusp re Mya Molar | 2005-Sep-22 | 2005-Dec-20 | 47 | View |
Tuesday, September 05, 2006 • Title: Development • Edited: Tuesday, September 05, 2006 • Entry ID: 215 • Client: |
|---|
Job Description
|
|---|
This job tracks development of JobWarden.
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Activity Incomplete |
Entry ID 235 Thu, 28 Sep 06 12:02 The new Show/Hide scripts need to be transplanted to the people_jobs template |
A | 0D:0H:0M | 0D:0H:0M | ||||
Activity Incomplete |
Entry ID 236 Thu, 28 Sep 06 12:04 Apply the new multi-parameter sort to the inclued list areas, especially jobslines in both jobs and people tracking |
A | 0D:0H:0M | 0D:0H:0M | ||||
Activity Incomplete |
Entry ID 216 Tue, 5 Sep 06 12:55 The new "About Us" interface needs to include events |
A | 2006-09-05 20:56 | 0D:0H:0M | 0D:0H:0M | |||
Activity Incomplete |
Entry ID 217 Tue, 5 Sep 06 12:56 When completed, the new "About Us" interface needs to be transplanted to the customer user spaces |
A | 2006-09-05 20:58 | 0D:0H:0M | 0D:0H:0M | |||
Activity Incomplete |
Entry ID 222 Wed, 20 Sep 06 1:14 Replace the 'Snippets' PI with the new Embed tag capability |
A | 2006-09-20 09:15 | 0D:0H:0M | 0D:0H:0M | |||
Activity Incomplete |
Entry ID 224 Wed, 20 Sep 06 1:26 The 'Events' capability needs to be restructured: 1. The 'Comments' field appears to have limited utility 2. There is a need for a 'Summary' field into which the 'Event' field can be abstracted. This would enable some users to be presented with the 'Summary' data rather than all the 'Event' detail. 3. Both of these fields' entry/edit displays need to be made larger and given WYSIWYG capabilities, and the displays should be fully HTML-formattable, with graphics and other embed capabilities |
A | 2006-09-20 09:27 | 0D:0H:0M | 0D:0H:0M | |||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Documents
|
|---|
| Title | Date | Last Edit | Entry ID |
|---|
Tuesday, September 05, 2006 • Title: Debugging • Edited: Tuesday, September 05, 2006 • Entry ID: 211 • Client: |
|---|
Job Description
|
|---|
This job records and tracks JobWarden debugging.
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Job Start |
Entry ID 212 Tue, 5 Sep 06 12:11 The debugging record was started today |
A | 2006-09-05 20:12 | 0D:0H:0M | 0D:0H:0M | |||
Activity Incomplete |
Entry ID 213 Tue, 5 Sep 06 12:13 The events variables are not being initrialised correctly. The should be restructured to that the cumulative iotems are initialised in the outer loop and the event trackers are initilaised in the inner loop |
A | 2006-09-05 20:15 | 0D:0H:0M | 0D:0H:0M | |||
Activity Incomplete |
Entry ID 214 Tue, 5 Sep 06 12:52 The e-mail notification system does not link correctly for events entries |
A | 2006-09-05 20:53 | 0D:0H:0M | 0D:0H:0M | |||
Activity Incomplete |
Entry ID 223 Wed, 20 Sep 06 1:18 A number of Space Headings are incorrect - e.g. a number have inappropriate 'Home' indicators. |
A | 2006-09-20 09:19 | 0D:0H:0M | 0D:0H:0M | |||
Activity Incomplete |
Entry ID 230 Wed, 20 Sep 06 9:05 The h3 tags in the "About Us" comments/entry page are invisible. They should be h6. The URL containing /comments_preview should be /{comments_preview_templ} |
A | 2006-09-20 17:06 | 0D:0H:0M | 0D:0H:0M | |||
Activity Incomplete |
Entry ID 233 Thu, 21 Sep 06 3:51 There appears to be a bug in the early/late detection logic for milestone events, which causes WMMTS events to be coded 'late'even when there is no schedule. |
A | 2006-09-21 11:53 | 0D:0H:0M | 0D:0H:0M | |||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Documents
|
|---|
| Title | Date | Last Edit | Entry ID |
|---|
Sunday, August 06, 2006 • Title: Test Job • Edited: Sunday, August 06, 2006 • Entry ID: 209 • Client: |
|---|
Job Description
|
|---|
Test Job
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Documents
|
|---|
| Title | Date | Last Edit | Entry ID |
|---|
Tuesday, March 14, 2006 • Title: Moonlighting? • Edited: Tuesday, April 11, 2006 • Entry ID: 140 • Client: |
|---|
Job Description
|
|---|
This test adds another job to test job tracking of people involved with multiple jobs.
Team
|
|---|
| Member Name | Member Role | Comments | Entry ID |
|---|---|---|---|
| Thomas Tallus | Team Leader | 155 |
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Assigned to | Comments | |
|---|---|---|---|---|---|---|---|---|
Job Start |
Entry ID 147 Fri, 17 Mar 06 10:13 Start scheduled future, no actual |
A | 0D:0H:0M | 0D:0H:0M | And another thing! | |||
| S | 2006-03-22 17:14 | 0D:0H:0M | 0D:0H:0M | |||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Documents
|
|---|
| Title | Date | Last Edit | Entry ID |
|---|
Team Member: Dick | Membership Date: Sunday, 13 November 2005 |
|---|
Dental Lab Case - Doctor Cusp DDS. Patient: Mya Molar
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Activity Incomplete |
Ceramic Workup | A | 0D:0H:0M | 0D:0H:0M | ||||
| S | 2005-09-26 13:08 | 0D:0H:0M | 0D:0H:0M | |||||
Activity Completed |
Stressbreaker arrived. Job transferred to model/prep department. Models poured, trimmed, pinned, articulated and dies cut out. | A | 2005-09-22 11:22 | 2005-09-22 15:22 | 0D:4H:0M | 0D:4H:0M | Received e-mail authorizing us to trim and die-cut the models. Ready for Wax/Finishing Department | |
| S | 2005-08-22 11:22 | 2005-08-22 15:22 | 0D:4H:0M | 0D:4H:0M | ||||
Activity Completed |
Step 3. Quality control bridge fit and correct design. | A | 2005-09-26 15:29 | 2005-09-26 18:13 | 0D:2H:44M | 0D:6H:44M | Ready for ceramic department | |
| S | 2005-09-22 09:47 | 2005-09-22 11:48 | 0D:2H:1M | 0D:6H:1M | ||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Team Member: Harry | Membership Date: Sunday, 13 November 2005 |
|---|
Dental Lab Case - Doctor Cusp DDS. Patient: Mya Molar
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Milestone |
Testing new single entry code | A | 0D:0H:0M | 0D:0H:0M | Enter comments here | |||
Activity Completed |
Driver collected job, checked in, disinfected and scheduled. Stressbreaker attachment ordered in. | A | 2005-09-21 15:13 | 2005-09-21 18:16 | 0D:3H:3M | 0D:3H:3M | No suitable stressbreaker in inventory. | |
| S | 2005-10-21 15:00 | 2005-10-21 19:00 | 0D:4H:0M | 0D:4H:0M | ||||
Activity Completed |
Step 2. Wax up 29-31 with male part of stressbreaker. Finish #29-31 | A | 2005-09-26 08:27 | 2005-09-26 13:28 | 0D:5H:1M | 0D:8H:4M | ||
| S | 2005-09-26 08:27 | 2005-09-26 15:42 | 0D:7H:15M | 0D:11H:15M | ||||
Milestone Incomplete |
Enter event description here | A | 2007-11-02 14:03 | 0D:5H:1M | 0D:8H:4M | Second try | ||
| S | 2007-11-02 14:03 | 0D:7H:15M | 0D:11H:15M | |||||
Milestone |
Enter event description here | A | 2007-11-03 13:45 | 2007-11-04 13:45 | 0D:5H:1M | 0D:8H:4M | No comment! | |
| S | 2007-11-02 13:45 | 2007-11-03 13:45 | 0D:7H:15M | 0D:11H:15M | ||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Team Member: Rank | Membership Date: Saturday, 25 February 2006 |
|---|
This member has no assignments
Team Member: Tom | Membership Date: Sunday, 13 November 2005 |
|---|
Dental Lab Case - Doctor Cusp DDS. Patient: Mya Molar
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Job Start |
Start Mya Molar Case | A | 2005-09-21 11:57 | 0D:0H:0M | 0D:0H:0M | |||
| S | 2005-09-20 11:57 | 0D:0H:0M | 0D:0H:0M | |||||
Activity Completed |
Step 1. Wax up abutment coping #28 with female part of stressbreaker. Finish #28 | A | 2005-09-22 15:25 | 2005-09-23 18:00 | 1D:2H:35M | 1D:2H:35M | ||
| S | 2005-09-21 15:25 | 2005-09-22 18:00 | 1D:2H:35M | 1D:2H:35M | ||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Moonlighting?
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Job Start |
Start scheduled future, no actual | A | 0D:0H:0M | 0D:0H:0M | And another thing! | |||
| S | 2006-03-22 17:14 | 0D:0H:0M | 0D:0H:0M | |||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||