| Jobs |
|---|
Tuesday, December 12, 2006 • Title: Dental Lab Case - Doctor Cusp DDS. Patient: Mya Molar • Edited: Tuesday, November 20, 2007 • Entry ID: 40 • Client: Development Test Group 2 |
|---|
Job Description
|
|---|
Prescription
28-31 PFM bridge with stressbreaker between 28 and 29
360 degree metal collar on #28 and 31
Shade: A2
Job Sheet
4 Unit posterior porcelain fused to metal bridge #28-#31
Stressbreaker
High noble silver coloured alloy
High fire porcelain
Shade: A2
Team
|
|---|
| Member Name | Member Role | Comments | Entry ID |
|---|---|---|---|
| Henry Tudor | Team Leader | Skuthrôpaz' hêd' hellada en gunê exênthismenai pragmata | 123 |
| Richard Plantagenet | Team Member | Orthostadia encheleis d' ara g' soi ê te ho erriptasmenon tachu kai hêmeis su. | 124 |
| Thomas Tallus | Team Member | 125 |
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Assigned to | Comments | |
|---|---|---|---|---|---|---|---|---|
Activity Incomplete |
Entry ID 152 Sun, 19 Mar 06 6:08 Ceramic Workup |
A | 0D:0H:0M | 0D:0H:0M | Richard Plantagenet | |||
| S | 2005-09-26 13:08 | 0D:0H:0M | 0D:0H:0M | |||||
Milestone |
Entry ID 495 Fri, 2 Nov 07 15:28 Testing new single entry code |
A | 0D:0H:0M | 0D:0H:0M | Henry Tudor | Enter comments here | ||
Job Start |
Entry ID 150 Sun, 19 Mar 06 4:57 Start Mya Molar Case |
A | 2005-09-21 11:57 | 0D:0H:0M | 0D:0H:0M | Thomas Tallus | ||
| S | 2005-09-20 11:57 | 0D:0H:0M | 0D:0H:0M | |||||
Activity Completed |
Entry ID 41 Sun, 16 Oct 05 7:09 Driver collected job, checked in, disinfected and scheduled. Stressbreaker attachment ordered in. |
A | 2005-09-21 15:13 | 2005-09-21 18:16 | 0D:3H:3M | 0D:3H:3M | Henry Tudor | No suitable stressbreaker in inventory. |
| S | 2005-10-21 15:00 | 2005-10-21 19:00 | 0D:4H:0M | 0D:4H:0M | ||||
Activity Completed |
Entry ID 42 Sun, 16 Oct 05 7:19 Stressbreaker arrived. Job transferred to model/prep department. Models poured, trimmed, pinned, articulated and dies cut out. |
A | 2005-09-22 11:22 | 2005-09-22 15:22 | 0D:4H:0M | 0D:7H:3M | Richard Plantagenet | Received e-mail authorizing us to trim and die-cut the models. Ready for Wax/Finishing Department |
| S | 2005-08-22 11:22 | 2005-08-22 15:22 | 0D:4H:0M | 0D:8H:0M | ||||
Activity Completed |
Entry ID 43 Sun, 16 Oct 05 7:22 Step 1. Wax up abutment coping #28 with female part of stressbreaker. Finish #28 |
A | 2005-09-22 15:25 | 2005-09-23 18:00 | 1D:2H:35M | 1D:9H:38M | Thomas Tallus | |
| S | 2005-09-21 15:25 | 2005-09-22 18:00 | 1D:2H:35M | 1D:10H:35M | ||||
Activity Completed |
Entry ID 44 Sun, 16 Oct 05 7:25 Step 2. Wax up 29-31 with male part of stressbreaker. Finish #29-31 |
A | 2005-09-26 08:27 | 2005-09-26 13:28 | 0D:5H:1M | 1D:14H:39M | Henry Tudor | |
| S | 2005-09-26 08:27 | 2005-09-26 15:42 | 0D:7H:15M | 1D:17H:50M | ||||
Activity Completed |
Entry ID 45 Sun, 16 Oct 05 7:27 Step 3. Quality control bridge fit and correct design. |
A | 2005-09-26 15:29 | 2005-09-26 18:13 | 0D:2H:44M | 1D:17H:23M | Richard Plantagenet | Ready for ceramic department |
| S | 2005-09-22 09:47 | 2005-09-22 11:48 | 0D:2H:1M | 1D:19H:51M | ||||
Milestone Reached |
Entry ID 151 Sun, 19 Mar 06 6:03 Transfer to Ceramic Department |
A | 2005-09-27 09:00 | 0D:0H:0M | 1D:17H:23M | |||
| S | 2005-09-23 13:03 | 0D:0H:0M | 1D:19H:51M | |||||
Milestone Reached |
Entry ID 494 Fri, 2 Nov 07 7:02 Enter event description here |
A | 2007-11-02 14:03 | 0D:0H:0M | 1D:17H:23M | Henry Tudor | Second try | |
| S | 2007-11-02 14:03 | 0D:0H:0M | 1D:19H:51M | |||||
Milestone Reached |
Entry ID 493 Fri, 2 Nov 07 6:45 Enter event description here |
A | 2007-11-03 13:45 | 2007-11-04 13:45 | 0D:0H:0M | 1D:17H:23M | Henry Tudor | No comment! |
| S | 2007-11-02 13:45 | 2007-11-03 13:45 | 0D:0H:0M | 1D:19H:51M | ||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Documents
|
|---|
| Title | Date | Last Edit | Entry ID | |
|---|---|---|---|---|
| To Dr Cusp re Mya Molar | 2005-Sep-22 | 2005-Dec-20 | 47 | View |
Page 1 of 1 pages