JobWarden Jobs Demonstration Logo
Jobs
Tuesday, December 12, 2006   •  Title: Dental Lab Case - Doctor Cusp DDS. Patient: Mya Molar  •  Edited:  Tuesday, November 20, 2007   •  
Entry ID: 40  •  Client: Development Test Group 2

Job Description

Prescription

28-31 PFM bridge with stressbreaker between 28 and 29 

360 degree metal collar on #28 and 31

Shade: A2

Job Sheet

4 Unit posterior porcelain fused to metal bridge #28-#31

Stressbreaker

High noble silver coloured alloy

High fire porcelain

Shade: A2              


Team
Member Name Member Role Comments Entry ID
Henry Tudor Team Leader Skuthrôpaz' hêd' hellada en gunê exênthismenai pragmata 123
Richard Plantagenet Team Member Orthostadia encheleis d' ara g' soi ê te ho erriptasmenon tachu kai hêmeis su. 124
Thomas Tallus Team Member 125

Events                    Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
Event Type Description Start End Duration to Date Assigned to Comments
Activity Ongoing
Activity Incomplete
Entry ID 152  Sun, 19 Mar 06 6:08
Ceramic Workup
A 0D:0H:0M 0D:0H:0M Richard Plantagenet
S 2005-09-26 13:08 0D:0H:0M 0D:0H:0M
Milestone
Milestone
Entry ID 495  Fri, 2 Nov 07 15:28
Testing new single entry code
A 0D:0H:0M 0D:0H:0M Henry Tudor Enter comments here
Started
Job Start
Entry ID 150  Sun, 19 Mar 06 4:57
Start Mya Molar Case
A 2005-09-21 11:57 0D:0H:0M 0D:0H:0M Thomas Tallus
S 2005-09-20 11:57 0D:0H:0M 0D:0H:0M
Activity Ongoing
Activity Completed
Entry ID 41  Sun, 16 Oct 05 7:09
Driver collected job, checked in, disinfected and scheduled. Stressbreaker attachment ordered in.
A 2005-09-21 15:13 2005-09-21 18:16 0D:3H:3M 0D:3H:3M Henry Tudor No suitable stressbreaker in inventory.
S 2005-10-21 15:00 2005-10-21 19:00 0D:4H:0M 0D:4H:0M
Activity Ongoing
Activity Completed
Entry ID 42  Sun, 16 Oct 05 7:19
Stressbreaker arrived. Job transferred to model/prep department. Models poured, trimmed, pinned, articulated and dies cut out.
A 2005-09-22 11:22 2005-09-22 15:22 0D:4H:0M 0D:7H:3M Richard Plantagenet Received e-mail authorizing us to trim and die-cut the models. Ready for Wax/Finishing Department
S 2005-08-22 11:22 2005-08-22 15:22 0D:4H:0M 0D:8H:0M
Activity Ongoing
Activity Completed
Entry ID 43  Sun, 16 Oct 05 7:22
Step 1. Wax up abutment coping #28 with female part of stressbreaker. Finish #28
A 2005-09-22 15:25 2005-09-23 18:00 1D:2H:35M 1D:9H:38M Thomas Tallus
S 2005-09-21 15:25 2005-09-22 18:00 1D:2H:35M 1D:10H:35M
Activity Ongoing
Activity Completed
Entry ID 44  Sun, 16 Oct 05 7:25
Step 2. Wax up 29-31 with male part of stressbreaker. Finish #29-31
A 2005-09-26 08:27 2005-09-26 13:28 0D:5H:1M 1D:14H:39M Henry Tudor
S 2005-09-26 08:27 2005-09-26 15:42 0D:7H:15M 1D:17H:50M
Activity Ongoing
Activity Completed
Entry ID 45  Sun, 16 Oct 05 7:27
Step 3. Quality control bridge fit and correct design.
A 2005-09-26 15:29 2005-09-26 18:13 0D:2H:44M 1D:17H:23M Richard Plantagenet Ready for ceramic department
S 2005-09-22 09:47 2005-09-22 11:48 0D:2H:1M 1D:19H:51M
Milestone
Milestone Reached
Entry ID 151  Sun, 19 Mar 06 6:03
Transfer to Ceramic Department
A 2005-09-27 09:00 0D:0H:0M 1D:17H:23M
S 2005-09-23 13:03 0D:0H:0M 1D:19H:51M
Milestone
Milestone Reached
Entry ID 494  Fri, 2 Nov 07 7:02
Enter event description here
A 2007-11-02 14:03 0D:0H:0M 1D:17H:23M Henry Tudor Second try
S 2007-11-02 14:03 0D:0H:0M 1D:19H:51M
Milestone
Milestone Reached
Entry ID 493  Fri, 2 Nov 07 6:45
Enter event description here
A 2007-11-03 13:45 2007-11-04 13:45 0D:0H:0M 1D:17H:23M Henry Tudor No comment!
S 2007-11-02 13:45 2007-11-03 13:45 0D:0H:0M 1D:19H:51M
Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending
Starts · bar       Ends · bar       Elapsed · bar       to Date · bar       Milestones · bar

Documents
Title Date Last Edit Entry ID
To Dr Cusp re Mya Molar 2005-Sep-22 2005-Dec-20 47 View

Page 1 of 1 pages