| Announcements |
|---|
|
Sunday, August 06, 2006 • Title: Test Announcement • Edited: Tuesday, January 22, 2008 Entry ID: 210 • Client: Demo Group |
|---|
Test Announcement content here. Retested.
Posted by
John
• Filed Under:
Jobs Announcements
Jobs Notices
(0) Comments • eMail This • Print This • Permalink
(0) Comments • eMail This • Print This • Permalink
|
Tuesday, January 16, 2007 • Title: About the Demonstration Site • Edited: Friday, November 16, 2007 Entry ID: 13 • Client: Development Test Group 1 |
|---|
The Demonstration Site serves the following purposes:
- As implemented here, it is a way for you to familiarize yourself with how JobWarden works from your customers’ or providers' point of view
- As implemented in your site, it will serve both as a demonstration for the benefit of your prospects, and as an online help for your existing users
- Access will be controlled by password and
- The banner name on each page will be the name of an individual customer
- News and
- Priority
The “Customers’ Jobs” Pages The “Jobs” pages of each customer’s area will of course be used to display job status and related items.
|
Friday, November 16, 2007 • Title: Testing • Edited: Friday, November 16, 2007 Entry ID: 506 • Client: Development Test Group 2 |
|---|
Testing
| Jobs |
|---|
Thursday, August 25, 2005 • Title: Decorator’s Case - Paint Facade of Lawyers Office • Edited: Monday, February 27, 2006 • Entry ID: 2 • Client: |
|---|
Job Description
|
|---|
Supply and erect scaffolding to insurance safety standards. Apply high-visibility tape to scaffolding at pedestrian level. Supply all equipment, ladders and materials. Remove peeling and flaking paint from all surfaces, fill and sand smooth.Use only water-based gloss and emulsion paints. Apply a quality gel-type thick undercoat.Apply two coats gloss black to match original, to all exposed timbers.
Apply two coats of gloss white to window surrounds to match existing. Apply two coats of gloss black to the door and door surrounds to match timbers. Work safely and clean up debris and spillages before leaving the site each day.
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Activity Completed |
Entry ID 11 Fri, 26 Aug 05 6:43 Meeting with client to finalise details |
A | 2005-08-26 14:45 | 2005-08-26 18:45 | 0D:4H:0M | 0D:4H:0M | We have to wait for a formal order in writing before proceeding | |
Activity Completed |
Entry ID 15 Thu, 8 Sep 05 2:29 Have received order and have scheduled a start date. Reviewed site access and scaffolding availability. |
A | 2005-09-08 10:32 | 2005-09-08 11:16 | 0D:0H:44M | 0D:4H:44M | Need three days notice for scaffolding contractor | |
Activity Completed |
Entry ID 32 Sun, 2 Oct 05 7:56 Our contractor erected Scaffolding. Began to remove flaking paint. |
A | 2005-09-22 10:00 | 2005-09-22 16:00 | 0D:6H:0M | 0D:10H:44M | ||
Activity Completed |
Entry ID 46 Sun, 16 Oct 05 7:33 Completed removal of flaking paint. Painted beams and posts black. |
A | 2005-09-26 08:35 | 2005-09-26 17:36 | 0D:9H:1M | 0D:19H:45M | ||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Documents
|
|---|
| Title | Date | Last Edit | Entry ID | |
|---|---|---|---|---|
| Thank You | 2005-Sep-08 | 2005-Sep-18 | 16 | View |
| Quote for Dorridge Lawyers Paint Job | 2005-Aug-25 | 2005-Oct-02 | 3 | View |
Assignments
Team Member: Dick | Membership Date: Sunday, 13 November 2005 |
|---|
Dental Lab Case - Doctor Cusp DDS. Patient: Mya Molar
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Activity Incomplete |
Ceramic Workup | A | 0D:0H:0M | 0D:0H:0M | ||||
| S | 2005-09-26 13:08 | 0D:0H:0M | 0D:0H:0M | |||||
Activity Completed |
Stressbreaker arrived. Job transferred to model/prep department. Models poured, trimmed, pinned, articulated and dies cut out. | A | 2005-09-22 11:22 | 2005-09-22 15:22 | 0D:4H:0M | 0D:4H:0M | Received e-mail authorizing us to trim and die-cut the models. Ready for Wax/Finishing Department | |
| S | 2005-08-22 11:22 | 2005-08-22 15:22 | 0D:4H:0M | 0D:4H:0M | ||||
Activity Completed |
Step 3. Quality control bridge fit and correct design. | A | 2005-09-26 15:29 | 2005-09-26 18:13 | 0D:2H:44M | 0D:6H:44M | Ready for ceramic department | |
| S | 2005-09-22 09:47 | 2005-09-22 11:48 | 0D:2H:1M | 0D:6H:1M | ||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Team Member: Harry | Membership Date: Sunday, 13 November 2005 |
|---|
Dental Lab Case - Doctor Cusp DDS. Patient: Mya Molar
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Milestone |
Testing new single entry code | A | 0D:0H:0M | 0D:0H:0M | Enter comments here | |||
Activity Completed |
Driver collected job, checked in, disinfected and scheduled. Stressbreaker attachment ordered in. | A | 2005-09-21 15:13 | 2005-09-21 18:16 | 0D:3H:3M | 0D:3H:3M | No suitable stressbreaker in inventory. | |
| S | 2005-10-21 15:00 | 2005-10-21 19:00 | 0D:4H:0M | 0D:4H:0M | ||||
Activity Completed |
Step 2. Wax up 29-31 with male part of stressbreaker. Finish #29-31 | A | 2005-09-26 08:27 | 2005-09-26 13:28 | 0D:5H:1M | 0D:8H:4M | ||
| S | 2005-09-26 08:27 | 2005-09-26 15:42 | 0D:7H:15M | 0D:11H:15M | ||||
Milestone Incomplete |
Enter event description here | A | 2007-11-02 14:03 | 0D:5H:1M | 0D:8H:4M | Second try | ||
| S | 2007-11-02 14:03 | 0D:7H:15M | 0D:11H:15M | |||||
Milestone |
Enter event description here | A | 2007-11-03 13:45 | 2007-11-04 13:45 | 0D:5H:1M | 0D:8H:4M | No comment! | |
| S | 2007-11-02 13:45 | 2007-11-03 13:45 | 0D:7H:15M | 0D:11H:15M | ||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Team Member: Rank | Membership Date: Saturday, 25 February 2006 |
|---|
This member has no assignments
Team Member: Tom | Membership Date: Sunday, 13 November 2005 |
|---|
Dental Lab Case - Doctor Cusp DDS. Patient: Mya Molar
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Job Start |
Start Mya Molar Case | A | 2005-09-21 11:57 | 0D:0H:0M | 0D:0H:0M | |||
| S | 2005-09-20 11:57 | 0D:0H:0M | 0D:0H:0M | |||||
Activity Completed |
Step 1. Wax up abutment coping #28 with female part of stressbreaker. Finish #28 | A | 2005-09-22 15:25 | 2005-09-23 18:00 | 1D:2H:35M | 1D:2H:35M | ||
| S | 2005-09-21 15:25 | 2005-09-22 18:00 | 1D:2H:35M | 1D:2H:35M | ||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
Moonlighting?
Events Legend: "A" = "Actual", "S" = "Scheduled." If no S, then no schedule exists
|
|---|
| Event Type | Description | Start | End | Duration | to Date | Comments | ||
|---|---|---|---|---|---|---|---|---|
Job Start |
Start scheduled future, no actual | A | 0D:0H:0M | 0D:0H:0M | And another thing! | |||
| S | 2006-03-22 17:14 | 0D:0H:0M | 0D:0H:0M | |||||
| Job Tracking. Red columns mean behind, green columns mean ahead of schedule or pending | ||||||||
|
Starts ·
|
||||||||
