Thursday, September 22, 2005 at 01:00
To Dr Cusp re Mya Molar
Do you require us to return the models for trimming and die-cutting?
Posted by
John
Filed Under: Job Files • Offsite Documents • e-Mails • (0) Comments • eMail This • Print This • Permalink
Back to Jobs
Filed Under: Job Files • Offsite Documents • e-Mails • (0) Comments • eMail This • Print This • Permalink
Back to Jobs
Thursday, September 08, 2005 at 01:38
Thank You
Mr Tom Lawrence
Dorridge Law Office
Station Approach
Dorridge, B93 8JA
Thank you for your order of 7 September.
We are scheduled to start painting your facade on or before September 21. You may keep up to date with current status and documentation relating to this job by signing on to Jobwarden.
Your ID is: DorridgeLaw1 (case sensitive)
Your Password is: 2DLStationApp (case sensitive.)
Sincerely
Posted by
John
Filed Under: Job Files • Offsite Documents • e-Mails • (0) Comments • eMail This • Print This • Permalink
Back to Jobs
Filed Under: Job Files • Offsite Documents • e-Mails • (0) Comments • eMail This • Print This • Permalink
Back to Jobs
Thursday, August 25, 2005 at 08:50
Quote for Dorridge Lawyers Paint Job
Supply and erect scaffolding to insurance safety standards. Apply high-visibility tape to scaffolding at pedestrian level.
Supply all equipment, ladders and materials.
Remove peeling and flaking paint from all surfaces, fill and sand smooth.
Use only water-based gloss and emulsion paints.
Apply a quality gel-type thick undercoat.
Apply two coats gloss black to match original, to all exposed timbers.
Apply two coats of gloss white to window surrounds to match existing.
Apply two coats of gloss black to the door and door surrounds to match timbers.
| Line | Description | Unit | Qty |
Unit
Price |
Price |
Tax
Rate % |
Tax | Total |
|---|---|---|---|---|---|---|---|---|
| 1 | Black gloss paint | 5 Litre | 9.00 | 23.40 | 210.60 | 17.50 | 36.85 | 247.45 |
| 2 | Labour and ancilliary materials | Hrs | 25.00 | 12.50 | 312.50 | 17.50 | 54.69 | 367.19 |
| 3 | Secure supply, erection and removal of scaffolding | Job | 1.00 | 783.00 | 783.00 | 17.50 | 137.03 | 920.03 |
| 4 | White gloss paint | 5 Litre | 8.00 | 25.60 | 204.80 | 17.50 | 35.84 | 240.64 |
| 5 | White undercoat (wood primer) | 5 Litre | 8.00 | 18.50 | 148.00 | 17.50 | 25.90 | 173.90 |
| Total | 290.31 | 1,949.21 | ||||||
Posted by
John
Filed Under: Job Files • Quotes • Accepted • (0) Comments • eMail This • Print This • Permalink
Back to Jobs
Filed Under: Job Files • Quotes • Accepted • (0) Comments • eMail This • Print This • Permalink
Back to Jobs
Page 1 of 1 pages